Preparation Of A Vessel Prior To Filling Crude Oil

529
Credit: Venti Views/Unsplash

A Skuld news source highlights a vessel’s preparation before crude oil loading.

The plan should start soon

When a vessel has been nominated to load crude oil, the planning should start as soon as possible.

If not received, the following should be requested for cargo planning:

  • MSDS for the cargo to be loaded
  • Quantity to be loaded (like min/max intake or vessels option +/- x %)
  • Cargo density
  • Any draft restriction at the loading terminal
  • If known, any draft restriction at the discharge port
  • If heating instruction applies
  • Prepare loading plan based on the available cargo information

Composition of the ship/shore safety checklist

The checklist has four main sections:

  • Pre-Arrival checks
  • Checklist after mooring
  • Checks pre-transfer (including agreements)
  • Summary of repetitive checks during and after transfer, until the tanker departs

Before arrival loading terminal

  • Pre-arrival check lists to be completed as per ISGOTT checklist Part 1A and 1B
  • Check how many loading arms that will be connected and size of the connections
  • Check that all cargo tank high level alarms are operative
  • If heating instruction applies, heating coils should be pressure tested
  • If no heating instruction applies, heating coils to be blown and blanked off
  • Check that the oxygen content in the cargo tanks is within required limits

All fast at loading terminal

  • Complete the ship/shore safety checklist – after mooring, as per ISGOTT checklist Part 3

Prior to cargo transfers

  • Complete the ship/shore safety checklist – Checks pre-transfer as per ISGOTT checklist Part 5A, 6 and 7A
    The checklist shall be completed in cooperation with the terminal representative (normally the loading master)

Declaration

Did you subscribe to our daily Newsletter?

It’s Free! Click here to Subscribe!

Source: Platts