Hydrex can perform bow thruster removals and reinstallations on all types of tunnel thrusters, reports the Maritime Executive.
These repairs are carried out in cooperation with OEMs on any location. They are performed while the vessel stays afloat without impact on its schedule.
Thruster operations using mobdocks
Tunnel thruster operations are carried out using our flexible mobdocks that close off the tunnel on both sides.
This allows divers to work in a dry environment around the unit. Hydrex’s range of flexible mobdocks can quickly be transported to any location around the world.
Longer drydock duration
In most cases a thruster overhaul is planned in during a scheduled drydocking. This usually means that the unit is removed in drydock.
The ships then has to wait for the overhauled thruster to return and be reinstalled before the vessel can leave drydock. This results in a longer drydock time and consequent cost.
Hydrex works with vessel afloat
Hydrex teams can however remove the unit while the ship is still afloat so it can already be brought to the manufacturer for the overhaul. When the vessel enters drydock the overhauled unit is ready for reinstallation without any delay.
The reverse procedure is also possible. If the thruster is removed in drydock, it can be reinstalled underwater in dry conditions at a later date. In this way the ship can already leave drydock while the unit is still with the manufacturer.
Did you subscribe to our daily newsletter?
It’s Free! Click here to Subscribe!
Source: The Maritime Executive