The MAIB released its report on the incident in which skipper, Jamie Kerr, died on the Carol Anne when the crane fitted to the vessel collapsed leaving the reader in little doubt that this was an avoidable accident. The installation of a crane to a workboat adds significant challenges for the marine surveyor when assessing the structure as this report highlights.
Summary:
On 30 April 2015, an Atlas lorry loader crane fitted on the workboat Carol Anne collapsed while being used to offload a net at a fish farm at Balure on Loch Spelve, Scotland. The crane fell onto the workboat’s skipper, who was declared deceased at the scene. The crane had been in operation since its installation 6½ weeks earlier. It was not overloaded when it failed.
The positions of the tie bolts
Safety Issues:
- No installation guidance was provided with the crane.
- The crane was installed with smaller and fewer tie bolts than intended by its manufacturer.
- The lock nuts were of a lower grade material strength than indicated by their markings.
- The statutory thorough examination and test of the crane following its installation did not identify the inadequacy of the mounting arrangement.
Crane installation showing inboard box section (circled)
Recommendations:
In July 2015, a recommendation (2015/142) was made to Atlas (UK), the crane’s supplier, to ensure the integrity of Atlas cranes installed on other workboats. In addition, in October 2015, West Yorkshire Trading Standards was informed of the misleading markings on the lock nuts.
Recommendation (2016/122) to Atlas Maschinen GmbH, the crane’s manufacturer, is aimed at ensuring that installation information is provided with all Atlas cranes fitted in the UK.
Recommendation (2016/123) to the Association of Lorry Loader Manufacturers and Importers is intended to improve the effectiveness of thorough examinations and testing of shipborne lorry loader cranes.
Recommendations (2016/124 and 2016/125) to the Maritime and Coastguard Agency and Inverlussa Marine Services, Carol Anne’s manager, are intended to improve adherence to, and the effectiveness of, established codes of practice with regard to the installation or replacement of shipborne cranes on workboats.
Did you subscribe for our daily newsletter?
It’s Free! Click here to Subscribe!
Source: MAIB