Lessons Learned: Crew Member Slips On Deck Breaking His Leg

415

A recent IMCA Safety Flash focuses on an incident in which three engineering crew members were involved in the manual handling of a bunker hose from an upper storage area to a lower deck storage area accessed via a spiral staircase, to provide lessons learned.

What happened

Three engineering crew members were involved in the manual handling of a bunker hose from an upper storage area to a lower deck storage area accessed via a spiral staircase. One of the engineers slipped on a greasy area of the deck breaking his right leg (fibula or calf bone) in the fall.

The spiral ladder did not allow evacuation by stretcher. Fortunately, however, the injured person was conscious and was able to assist the rescue team and go up the stairs. Our member noted that a later drill highlighted that in the case of an unconscious casualty, the safest rescue route would have been to unbolt a vertical hatch leading to the bottom carousel area, which would have proved to have been time consuming.

What went wrong

  • The area where the engineer slipped was an isolated spot that did not have any grating installed on the deck. It was also contaminated with grease and water from a previous task;
  • The engineers were interrupted in their task by the requirement to conduct another task elsewhere;
  • The bunker hose was routed vertically. As a result, residual water from within the hose was able to escape and pool on the deck below where crew accessed the storage area;
  • The presence of grating nearly everywhere gives a false perception of a non-slippery surface;
  • A Manual Handling Assessment was not considered for the task.

Learnings

  • If available, place caps on end of hoses to eliminate water spillage;
  • Ensure non-slip deck coating is applied in all exposed areas in storage rooms, and assess all other work and storage areas and apply same coating where required;
  • Develop a manual handling assessment for the movement of bunkering hoses, incorporating the use of mechanical lifting aids wherever possible.
  • Rescue equipment available onboard for an unconscious casualty – a stretcher – was not suitable for a rescue through the spiral ladders;
  • Identify all areas onboard the vessel presenting difficult rescue (with limited access/egress) and consider additional rescue drills in all identified areas complete with designated rescues plans.

Did you subscribe to our daily newsletter?

It’s Free! Click here to Subscribe!

Source: IMCA

1 COMMENT

  1. Unquestionably believe that which you said. Your favorite reason appeared to be on the net the easiest thing to be aware of. I say to you, I certainly get irked while people consider worries that they just do not know about. You managed to hit the nail upon the top and defined out the whole thing without having side effect , people could take a signal. Will likely be back to get more. Thanks

Comments are closed.