Liaison Between Ship And Shore

731

  • Operations concerning cargo handling, tank cleaning and pre-wash, ballasting and bunkering require an exchange of information between the ship and terminal.
  • Before loading or unloading commences the communications system should be adequately tested.
  • Allowance should be made for the time required for action in response to signals.

Operations concerning cargo handling, tank cleaning and pre-wash, ballasting and bunkering require an exchange of information between the ship and terminal before the ship arrives or after arrival, says an article published on chemical tanker guide website. 

Checklist of items that could be considered for inclusion

The following is a possible checklist of items that could be considered for inclusion in such an information exchange:

  1. The maximum draught of the ship and maximum light freeboard.
  2. Cargo specifications, to include the proper bulk shipping names, the nominated quantities to be transferred, expected temperature during transfer, flashpoint (where applicable), specific gravity, the MARPOL pollution category if applicable, and any viscosity and solidifying information.
  3. Availability of emergency and health data for each cargo to be handled.
  4. Where the ship has part cargoes which will remain on board, the cargo name, volume and tank distribution of each cargo.
  5. Any unusual characteristics of the cargo requiring special attention.
  6. Proposed disposition of nominated cargo and preferred order of loading or discharge.
  7. Details of cargo tank preparation for-loading, including previous cargo carried, method of tank cleaning (if any), state of the cargo tanks and lines, and water dips in cargo tanks (where applicable).
  8. Number and sizes of hoses or arms to be used, manifold connections required for each cargo to be handled and any limitations on the movement of hoses or arms.
  9. Maximum pumping rates and maximum pressure -available at the ship/shore cargo connection, and any restrictions due to inherent properties of the cargo.
  10. Communication system for cargo control, including the signal for emergency stop.
  11. Restrictions relating to electrostatic properties of a product, and precautions to prevent the generation of hazardous static electricity charges.
  12. The use of automatic emergency shutdown valves, and their closing period.
  13. Tank venting requirements and details of any required vapour return lines.
  14. Tank environmental control requirements, e.g. drying and inert gas, and quality of inert gas (if applicable).
  15. Whether foot samples or normal samples are to be taken, and any suspension of cargo operation while samples are being analysed.
  16. Terminal or port regulations on pre-washing of cargo tanks alongside the berth, and details of reception facilities available to receive slops (if applicable).
  17. Mandatory pre-wash requirements, cargo names and quantity of washings for discharge to reception facilities, and quantity, quality and disposition of slops (if applicable).
  18. Whether alongside tank cleaning is required in addition to pre-wash.
  19. Ballasting or deballasting requirements of the ship: if deballasting, the disposition, composition and quantities of ballast on board together with time required for discharge; if ballasting, the approximate time of commencement and the duration of ballasting into ballast or cargo tanks that will impinge upon cargo operations.
  20. Proposed bunker handling to be done during port visit, including time, location of bunker manifold, whether delivery is to be from barge or quay, and whether cargo transfer will be interrupted.
  21. Any other limitations at the terminal.
  22. Measures to prevent accidental exposure of personnel to cargo vapours or contact with cargo liquids.
  23. Action to be taken in the event of spills or leaks.

Loading plan

On the basis of the information exchanged, an operational plan for the order of cargo handling should be made by the responsible officer covering the items felt to be significant, including a cargo plan showing cargo distribution. 

The operational plan should include indications of the expected duration of the operation, and the sequence in which the ship’s tanks are to be loaded or discharged.

Ship/Shore Safety Checklist

The Ship/Shore Safety Checklist concerns the safety of the ship, the terminal and all personnel, and should be completed jointly by the responsible officer and the terminal representative. Each item should be verified before it is ticked.

This will entail a physical check by the two persons concerned which should be conducted jointly where appropriate. The completed checklist is of no value if it is merely regarded as a paper exercise. 

It is emphasised that some of the items on the checklist will require several physical checks or even continuous supervision during the operation.

Communications during cargo operations

To ensure the safe control of cargo operations at all times, it should be the responsibility of both parties to establish, agree in writing and maintain a reliable communications system.

Before loading or unloading commences the communications system should be adequately tested. A secondary stand-by system should also be established and agreed and tested. 

Allowance should be made for the time required for action in response to signals. The use of one radio channel by more than one ship/shore combination should be avoided.

Did you subscribe to our daily newsletter?

It’s Free! Click here to Subscribe!

Source: chemical tanker guide