LNG carrier

11721

LNG Rivers, with a capacity of 135 000 cubic metres

An LNG carrier is a tank ship designed for transporting liquefied natural gas (LNG). As the LNG market grows rapidly,[1] the fleet of LNG carriers continues to experience tremendous growth.

History

Diagram of new build rate.

The first LNG carrier Methane Pioneer (dwt 5034 tons) left the Calcasieu River on the Louisiana Gulf coast on 25 January 1959. Carrying the world’s first ocean cargo of LNG, it sailed to the UK where the cargo was delivered. Subsequent expansion of that trade has brought on a large expansion of the fleet to today where giant LNG ships carrying up to 266,000 m3 are sailing worldwide. At the end of 2005, a total of 203 vessels have been built, of which 193 are still in service.

The success of the specially modified C1-M-AV1-type standard ship Normarti, renamed The Methane Pioneer, caused the Gas Council and Conch International Methane Ltd. to order two purpose built LNG carriers to be constructed: the Methane Princess and the Methane Progress. The ships were fitted with Conch independent aluminum cargo tanks and entered the Algerian LNG trade in 1964. These ships had a capacity of 27,000 cubic meters.

In the late 1960s opportunity arose to export LNG from Alaska to Japan, and in 1969 that trade was initiated. Two ships, each with a capacity of 71,500 cubic meters, were built in Sweden. In the early 1970s, the US Government encouraged US shipyards to build LNG carriers, and a total of 16 LNG ships were built. The late 1970s and early 1980s brought the prospect of Arctic LNG ships with a number of projects being studied.

With the increase in cargo capacity to approximately 143,000 cubic meters, new tank designs were developed, from Moss Rosenberg to Technigaz Mark III and Gaztransport No.96.

In recent years, the size and capacity of LNG carriers has increased greatly. Since 2005, Qatargas has pioneered the development of two new classes of LNG carriers, referred to as Q-Flex and Q-Max. Each ship has a cargo capacity of between 210,000 and 266,000 cubic meters and is equipped with a re-liquefaction plant.

New Building

LNG carrier under construction atDSME shipyard, Okpo-dong

According to a presentation by Golar LNG Partners, in June 2012 there were 72 new builds on order. Today the majority of the new ships under construction are in the size of 120,000–140,000 m3 But there are orders for ships with capacity up to 260,000 m3. As of end of 2011, there are 359 LNG ships engaged in the deepsea movement of LNG.[2]

In the case of small scale LNG carriers (LNG carriers below 40,000 cbms), the optimal size for the new buildings will be determined by the project to which they are built against. This optimal size will be calculated considering volumes, destinations and vessels characteristics. [3]

Cargo handling

A typical LNG carrier has four to six tanks located along the center-line of the vessel. Surrounding the tanks is a combination of ballast tanks, cofferdamsand voids; in effect, this gives the vessel a double-hull type design.

Inside each tank there are typically three submerged pumps. There are two main cargo pumps which are used in cargo discharge operations and a much smaller pump which is referred to as the spray pump. The spray pump is used for either pumping out liquid LNG to be used as fuel (via a vaporizer), or for cooling down cargo tanks. It can also be used for “stripping” out the last of the cargo in discharge operations. All of these pumps are contained within what is known as the pump tower which hangs from the top of the tank and runs the entire depth of the tank. The pump tower also contains the tank gauging system and the tank filling line, all of which are located near the bottom of the tank.

In membrane-type vessels there is also an empty pipe with a spring-loaded foot valve that can be opened by weight or pressure. This is the emergency pump tower. In the event both main cargo pumps fail the top can be removed from this pipe and an emergency cargo pump lowered down to the bottom of the pipe. The top is replaced on the column and then the pump is allowed to push down on the foot valve and open it. The cargo can then be pumped out.

All cargo pumps discharge into a common pipe which runs along the deck of the vessel; it branches off to either side of the vessel to the cargo manifolds, which are used for loading or discharging.

All cargo tank vapour spaces are linked via a vapour header which runs parallel to the cargo header. This also has connections to the sides of the ship next to the loading and discharging manifolds.

Typical cargo cycle

A typical cargo cycle starts with the tanks in a “gas free” condition, meaning the tanks are full of air, which allows maintenance on the tank and pumps. Cargo cannot be loaded directly into the tank, as the presence of oxygen would create an explosive atmospheric condition within the tank, and the rapid temperature change caused by loading LNG at −162 °C could damage the tanks.

First, the tank must be ‘inerted’ to eliminate the risk of explosion. An inert gas plant burns diesel in air to produce carbon dioxide (CO2); this is blown into the tanks until the oxygen level is below 4%.

Next, the vessel goes into port to “gas-up” and “cool-down”, as one still cannot load directly into the tank: The CO2 will freeze and damage the pumps and the cold shock could damage the tank’s pump column.

Liquid LNG is brought onto the vessel and taken along the spray line to the main vaporiser, which boils off the liquid into gas. This is then warmed up to roughly 20 °C in the gas heaters and then blown into the tanks to displace the “inert gas”. This continues until all the CO2 is removed from the tanks. Initially, the IG (inert gas) is vented to atmosphere. Once the hydrocarbon content reaches 5% (lower flamability range of methane) the inert gas is redirected to shore via a pipeline and manifold connection by the HD (high duty) compressors. The shore terminal then burns this vapour to avoid the dangers of having large amounts of hydrocarbons around which may explode.

Now the vessel is gassed up and warm. The tanks are still at ambient temperature and are full of methane.

The next stage is cool-down. Liquid LNG is sprayed into the tanks via spray heads, which vaporises and starts to cool the tank. The excess gas is again blown ashore to be re-liquified or burned at aflare stack. Once the tanks reach about −140 °C the tanks are ready to load bulk.

Bulk loading starts and liquid LNG is pumped from the storage tanks ashore into the vessel tanks. Displaced gas is blown ashore by the HD compressors. Loading continues until typically 98.5% full is reached (to allow for thermal expansion/contraction of cargo).

The vessel can now proceed to the discharge port. During passage various boil-off management strategies can be used. Boil-off gas can be burned in boilers to provide steam for propulsion, or it can be re-liquefied and returned to the cargo tanks, depending on the design of the vessel.

Once in the discharge port, the cargo is pumped ashore using the cargo pumps. As the tank empties, the vapour space is filled by either gas from ashore or by vaporising some cargo in the cargo vaporiser. Either the vessel can be pumped out as far as possible, with the last being pumped out with spray pumps, or some cargo can be retained on board as a “heel”.

If all the cargo is pumped ashore, then on the ballast passage the tanks will warm up to ambient temperature, returning the vessel to a gassed up and warm state. The vessel can then be cooled again for loading.

If the vessel is to return to a gas free state, the tanks must be warmed up by using the gas heaters to circulate warm gas. Once the tanks are warmed up, the inert gas plant is used to remove the methane from the tanks. Once the tanks are methane free, the inert gas plant is switched to dry air production, which is used to remove all the inert gas from the tanks until they have a safe working atmosphere.

Containment systems

The inside of a LNG carrier

Today there are four containment systems in use for new build vessels. Two of the designs are of the self-supporting type, while the other two are of the membrane type and today the patents are owned by Gaz Transport & Technigaz (GTT).

There is a trend towards the use of the two different membrane types instead of the self-supporting storage systems. This is most likely because prismatic membrane tanks utilize the hull shape more efficiently and thus have less void space between the cargo-tanks and ballast tanks. As a result of this, Moss-type design compared to a membrane design of equal capacity will be far more expensive to transit the Suez Canal. However, self-supporting tanks are more robust and have greater resistance to sloshing forces, and will possibly be considered in the future for offshore storage where bad weather will be a significant factor.

Moss tanks (Spherical IMO type B LNG tanks)

This design is owned by the Norwegian company Moss Maritime and it is a spherical tank. Most Moss type vessels have 4 or 5 tanks.

The outside of the tank has a thick layer of foam insulation that is either fitted in panels or in more modern designs wound round the tank. Over this insulation is a thin layer of “tinfoil” which allows the insulation to be kept dry with a nitrogen atmosphere. This atmosphere is constantly checked for any methane that would indicate a leak of the tank. Also the outside of the tank is checked at roughly 3 month interval for any cold spots that would indicate breakdown in the insulation.

The tank is supported around its circumference by the equatorial ring which is supported by a large circular skirt which takes the weight of the tank down to the ships structure. This skirt allows the tank to expand and contract during cooldown and warm-up operations. During cooldown or warm-up the tank can expand or contract about 60 cm. Because of this expansion and contraction all piping into the tank comes in via the top and is connected to the ships lines via flexible bellows.

Inside each tank there is a set of spray heads. These heads are mounted around the equatorial ring and are used to spray Liquid LNG onto the tank walls to reduce the temperature.

It is normal practice to keep onboard 5% to 10% of the cargo after discharge in one tank. This is referred to as the heel and this is used to cooldown the remaining tanks that have no heel before loading. This must be done gradually otherwise the tanks will be cold shocked if loaded directly into warm tanks. Cooldown can take roughly 36 hours on a Moss vessel so carrying a heel allows cooldown to be done before the vessel reaches port giving a significant time saving.

Tanks normally have a working pressure of up to 22 kPa, but this can be raised for an emergency discharge. If both main pumps fail then to remove the cargo, the tank’s safety valves are adjusted to lift at 1bar. Then the filling line which goes to the bottom of the tank is opened along with the filling lines of the other tanks on board. The pressure is then raised in the tank with the defective pumps which pushes the cargo into the other tanks where it can be pumped out of.

IHI (Prismatic IMO type B LNG tanks)

Ishikawajima-Harima Heavy Industries has developed the self-supporting prismatic type B (SPB) tank. Only two vessels currently have the SPB containment system. No reported sloshing problems ever happened on Type B LNG tanks. This is an important advantage over Membrane LNG carrier tanks which may break due to sloshing impact, therefore destroying the ship’s hull. This is also of prime relevance for FPSO LNG (or FLNG). In addition, IMO type B LNG tanks can sustain internal accidental damage due for example to internal equipment releases. Of course, for membrane LNG tanks, this is absolutely not the case; Several incidents occurred inside membrane LNG tanks.

TGZ Mark III

This design is originally by Technigaz and it is of the membrane type. The membrane consists of stainless steel with ‘waffles’ to absorb the thermal contraction when the tank is cooled down. The primary barrier, made of corrugated stainless steel of about 1.2 mm thickness is the one in direct contact with the cargo liquid (or vapour in empty tank condition). This is followed by a primary insulation which in turn is covered by a secondary barrier made of a material called “triplex” which is basically a metal foil sandwiched between glasswool sheets and compressed together. This is again covered by a secondary insulation which in turn is supported by the ship’s hull structure from the outside.

So, going from the inside of the tank outwards, we have:-

LNG

Primary barrier of 1.2 mm thick corrugated/waffled stainless steel

Primary insulation (also called the interbarrier space)

Secondary barrier of triplex membrane

Secondary insulation (also called the insulation space)

Ship’s hull structure.

GT96

This is Gaz Transport’s tank design. The tanks consists of a primary and secondary thin membrane made of the material Invar which has almost no thermal contraction. The insulation is made out of plywood boxes filled with perlite and continuously flushed with nitrogen gas. The integrity of both membranes is permanently monitored by detection of hydrocarbon in the nitrogen. An evolution is proposed by NG2, with the replacement of nitrogen by argon as the flushed inert and insulation gas. Argon has a better insulation power than nitrogen, which could save 10% of boil-off gas.

CS1

CS1 stands for Combined System Number One. It was designed by the now merged Technigaz and GazTransport companies and consists of the best components of both MkIII and No96 systems. The primary barrier is made of invar 0.7 mm, and secondary from Triplex. The primary and secondary insulation consists of polyurethane foam panels.

Three vessels with CS1 technology have been built by one shipyard, but established shipyards have decided to maintain production of the MKIII and NO96.

Reliquefaction and boil-off

In order to facilitate transport, natural gas is cooled down to approximately −163 °C at atmospheric pressure, at which point the gas condenses to a liquid. The tanks on board an LNG carrier effectively function as giant thermoses to keep the liquid gas cold during storage. No insulation is perfect, however, and so the liquid is constantly boiling during the voyage.

According to WGI, on a typical voyage an estimated 0.1–0.25% of the cargo converts to gas each day, depending on the efficiency of the insulation and the roughness of the voyage.[4] In a typical 20-day voyage, anywhere from 2–6% of the total volume of LNG originally loaded may be lost.[4]

Normally an LNG tanker is powered by steam turbines with boilers. These boilers are dual fuel and can run on either methane or oil or a combination of both.

The gas produced in boil off is traditionally diverted to the boilers and used as a fuel for the vessel. Before this gas is used in the boilers, it must be warmed up to roughly 20 °C by using the gas heaters. The gas is either fed into the boiler by tank pressure or it is increased in pressure by the LD compressors.

What fuel the vessel runs on is dependent on many factors which include the length of the voyage, desire to carry a heel for cooldown, price of oil versus price of LNG.

There are three basic modes available.

Minimum boil-off/maximum oil:- In this mode tank pressures are kept high to reduce boil off to a minimum and the majority of energy comes from the fuel oil. This maximises the amount of LNG delivered but does allow tank temps to rise due to lack of evaporation. The high cargo temps can cause storage problems and offloading problems.

Maximum boil-off/minimum oil:- In this mode the tank pressures are kept low and you have a greater boil-off but still there is a large amount of fuel oil used. This decreases the amount of LNG delivered but the cargo will be delivered cold which many ports prefer.

100% gas:- Tank pressures are kept at a similar level to max boil off but this is not enough to supply all the boilers needs so you must start to “force”. A small pump is started in one tank to supply LNG to the forcing vaporiser, where the LNG is warmed and vaporized back into a gas that is usable in the boilers. In this mode no fuel oil is used.

Recent advances in technology reliquefication plants to be fitted to vessels, allowing the boil off to be reliquefied and returned to the tanks. Because of this, the vessels’ operators and builders have been able to contemplate the use of more efficient slow-speed Diesel engines (previously most LNG carriers have been steam turbine-powered). Exceptions are the LNG carrier Havfru (built as Venator in 1973), which originally had dual fuel diesel engines, and its sister-ship Century (built as Lucian in 1974), also built with dual fuel gas turbines before being converted to a diesel engine system in 1982. Vessels using dual or tri-fuel diesel electric propulsion systems are now in service.

See also

References

 Credit:Wikimedia
SHARE
Previous articleOil tanker
Next articleCargo ship