Preventing Accidents When Clearing Shore Pipelines

267

Accidents related to shore pipeline clearing operations are on the rise. Over-pressurization or overfilling of tanks can cause physical damage, pollution, and even personal injuries. This article gives an overview of best practices to reduce risks and prevent losses, reports Grad.

Risks of pigging and line-blowing

Over the last few months, Gard has seen a marked increase in incidents related to the clearing of shore pipelines. The causes can vary: over-pressurization of tanks can cause physical damage, and overfilling of tanks can cause spillage, pollution, and personal injuries. In Gard, we have seen examples of all this – including several cases of “near misses” over the past few years.

The procedures used for clearing shore pipelines will depend on the facilities available at each terminal and the type of cargo loaded. Usually, they involve either line blowing or pigging (see fact box below). Both methods involve transferring large amounts of liquid or gas through the pipelines. Due to the sheer volume being transferred, this flow must be controlled at the manifold with the manifold valve. Moreover, good communication during the entire operation is key to preventing incidents.

Most accidents leading to structural damage to vessel tanks are caused by either too high a volume of gas being supplied, too much cargo being pushed into the tank, or that the speed of inflow being too high.

Planning and responsibilities

All cargo operations must be carefully planned and documented well in advance of execution. The details of the plans must be discussed with all personnel, both on the ship and at the terminal. The Master should ensure that everyone involved is properly trained and fully aware of the challenges associated with the pipeline-clearing operations. A pre-cargo operation meeting between personnel responsible for the operation from the ship and the terminal should confirm all critical interface parameters.

At the commencement of loading, and each change of watch or shift, the Responsible Officer and the Terminal Representative should each confirm that the communications system for the control of loading is understood by the personnel assigned to duties during the cargo operation. During the operation, there should be continuous and direct communication between the terminal and the ship until the operation has been completed and all valves have been closed.

Recommendations

To minimize the risk of over-pressurization:

  • Avoid using tanks that are loaded close to 98% as reception tanks for line clearing. Include a safety margin when estimating required ullages for reception tanks to account for potential inaccuracies in the terminal’s declared “pigging quantities”.
  • Consider including provisions for a standby cargo tank to be lined up and ready to be opened should the risk of overfill arise.
  • Keep manifold valves closed during idle periods. This will prevent accidental over-pressurization due to shore error.
  • Ensure that the vapor return line to shore is open during the operation (when available).
  • Monitor the manifold pressure closely and throttle the main manifold valve as required. At the start of the pigging operation, the valve should be opened minimally to control the flow and volume of liquid and propellant gas into the nearly full cargo tank. Gard strongly recommends that only properly trained and experienced personnel are assigned duties related to the operation of the ship manifold valves.
  • Monitor the available amount of cargo tank ullage space and pressure in the tank. If the volume and/or pressure becomes too high, close the manifold valve, and alert the terminal to stop pigging.
  • During freezing weather conditions, inspect tank vents (P/V valves) at regular intervals. Some products will freeze and clog the vents thereby creating pressure.
  • Close the manifold valves immediately (in agreement with the terminal) once a pig has reached its receiver/trap to avoid compressed propelling gas entering a loaded cargo tank.
  • When loading operations are complete, make sure that the manifold valve is fully closed before starting to clear the shoreline.
  • Report immediately to the terminal any abnormalities or deviations from normal procedures.

In short, several aspects can reduce the risk of over-pressurization and overfill during the clearing of shore pipelines: Increased awareness, training, careful pre-planning with terminal counterparts, and last but not least, good communication between the ship and terminal personnel.

Did you subscribe to our daily Newsletter?

It’s Free! Click here to Subscribe

Source: Grad