Skuld Shares Hot Tips for Soybean Shipment

938

  • Soybeans in their original form are not listed under the IMSBC Code.
  • Compared to other grain cargoes, soybeans are a perishable commodity and not meant to be stored for an extended duration.
  • Useful tips which have been complimented by comments from Skuld’s Loss Prevention department.

Soybeans in their original form are not listed under the IMSBC Code. Shipment in bulk is subject to the IMO International Convention for the Safe Carriage of Grain in Bulk (the “Grain Code”), says an article published on skuld website. 

Main cause for damage to soybean cargo 

Compared to other grain cargoes, soybeans are a perishable commodity and not meant to be stored for an extended duration.

The main cause for damage to a soybean cargo is its inherent sensitivity to high moisture contents, and high temperature at load port makes the cargo even more likely to suffer damage. 

Warm soybeans can release moisture, leading to a warm and humid atmosphere within the cargo bulk which consequently can allow mould to grow resulting in self-heating and cargo damage during a lengthy sea voyage.

Chinese law

China, the leading soybean importer, naturally produces the largest number and most costly soybean claims against shipowners. 

It is also well known that, notwithstanding Chinese law providing an exemption of carrier’s liability for loss or damage caused by “natural characteristics or inherent defect of the goods” (Article 51 (9) of the 1992 Maritime Code), it is extremely difficult for shipowners to invoke that exemption in litigation.

Useful tips which have been complimented by comments from Skuld’s Loss Prevention department

1. Keep detailed ventilation logs

The ventilation logs shall be properly prepared and recorded. In a recent PRC Supreme Court Judgment, the judges agreed that dew points/temperatures/humidity inside and outside the cargo holds shall be recorded daily from the loading date to discharge date. 

In addition, if ventilation has been carried out, the date, time and methods shall be recorded in detail. If ventilation was not carried out, the reasons (such as fumigation restriction, bad weather, rough sea etc.) shall be recorded.

Skuld’s Recommendation: The effect of ventilation on bulk cargo is limited to surface ventilation, with air flowing over the surface of the cargo from ventilators. Through ventilation is not required and is not possible to achieve on ships. 

Even when mechanically ventilated, air will only pass around the periphery of the stowage. Ventilation can therefore not prevent or reduce cargo damage caused by self-heating below the surface within the bulk of the cargo. 

If the soybean cargo has been fumigated upon shipment, the cargo holds must not be ventilated until the minimum fumigation period has expired, and care must be taken to ensure that subsequent ventilation does not endanger the crew. 

As fumigation requirements may prevent the Master from ventilating the cargo during the voyage, full and clear instructions need to be received from the charterers and shippers, bearing in mind the loading/discharging port authorities may have specific requirements. 

For instance, if the soybeans were loaded in a US port and fumigated there, the crew must be aware that as per the regulations of the United States Department of Agriculture (USDA), the cargo is not to be ventilated before discharge. 

This means that the cargo is not to be ventilated at all, unless the ship owners have written instructions from their charterers to ventilate the cargo despite the fumigation, otherwise owners open themselves up for a damage claim from Charterers for fumigation failure and insect presence.  Typically, from South American ports, fumigation of around 10 days is stipulated.

However, as the Chinese lawyers suggest, it is indeed legally important that shipowners conduct ventilation when necessary and when safe to do so – and keep records, otherwise they can be found liable under Chinese law.

 2.  Make sure the ventilation records are consistent

On recording the ventilation methods and duration, the Master and duty officers should be reminded that such contents, if recorded in the logbook, must be consistent with what is inserted in the ventilation logs.

In our experience, even where detailed and strong ventilation logs were submitted then, if there was any inconsistency between the logbook and the ventilation logs, for example regarding measures or period of ventilation, the Court would disregard the evidence because of the inconsistency and find against shipowners for having failed to exercise due diligence to care for the cargo.

3. Document hard copies of the ventilation logs or email them daily

In many cases, ventilation logs are recorded on an editable Microsoft Excel template, which is then saved as a digital document. 

It is updated by the Chief Officer or other duty officer daily. In some of our cases, the cargo receivers would challenge the electronic ventilation log on the grounds that an Excel template can be easily altered and therefore the electronic data are alleged to be unreliable.

To avoid the data being challenged in such a way we recommend that, in addition to properly filing it in onboard, a copy of the daily ventilation logs can be converted to PDF-format and emailed from the vessel to owners and charterers at the end of each day during the voyage. 

Such will allow a Chinese Notary Public to later notarise the emails in China to enhance the credibility in the evidence.

4.   Get a surveyor there

If possible, Owners (or their appointed surveyors) should monitor loading operations and take photographs of the cargo in each hold regularly. 

Cargo temperatures are needed anyway for the ventilation regime, and these can be very helpful to assess the cargo condition on loading and its longevity for the voyage.

When hatches are open before arriving the discharge port, they may also take photographs of the apparent condition of the cargo. 

These photographs can form a traceable record of the condition of the cargo during carriage. It is particularly useful evidence when there is a delay in discharge as the pictures can reflect the gradual change in the cargo condition.

Skuld Recommendation: If the surveyor at the loading port raises any doubt regarding the cargo’s condition, owners should involve the charterers and make sure they give clear instruction (and if appropriate, an indemnity) so as to preserve owners’ rights under the charterparty. Skuld should also be informed immediately so that proper steps can be considered.

 At discharging port, if damage is suspected, for example if the vessel has been at sea for an extended period or stuck in port congestion, Skuld recommends owners to have an independent cargo surveyor attending on their behalf when the hatch covers are opened and throughout the duration of the cargo discharge operations. This is to witness any cargo damage caused by the extended storage time.

5. Beware of delay in discharging port

If a delay in the berthing schedule is expected, owners should inform Skuld as soon as possible. 

Independent specialists should be sent on board to take representative cargo samples from all cargo holds prior to, throughout, and after the discharge operations in accordance with appropriate sampling standards and where practically possible. 

In case the appointed cargo surveyor witnesses damaged cargo, owners should immediately contact charterers to have them instruct stevedores to segregate the cargo during discharge operations.

In case the vessel has to wait for discharge at the anchorage, owners’ lawyers may be instructed to send a demand letter to the concerned parties, requesting them to take delivery of the cargo without delay and hold receivers liable for cargo damage caused by delay in discharge. 

This is a lesson learned from another case we handled: the vessel waited for more than three months at the anchorage, yet owners never requested the cargo receiver to take delivery of cargo. 

As a result, in subsequent proceedings, the cargo receiver tried to blame owners for failing to inform them to take delivery of cargo in time. In addition to the demand letter requesting delivery, owners should ask for an alternative port of discharge to have the cargo to come off their vessel as soon as possible.

Skuld Recommendation: Also, when delay is expected, owners should send a notice to charterers holding them liable for any damage caused to the soybeans because of the extended storage time of the cargo on board. 

In addition, owners should exercise pressure on charterers to nominate an alternative port of discharge where the cargo can come off sooner as any day the vessel is held up in congested port increases the risk of the cargo being damaged.

 If delays are encountered, following the proper ventilation regimes exactly the same way as during the voyage is strongly advised. All too often, crews will assume that end of voyage means end of ventilation.

 We would also recommend that inspections are conducted of each hold on a weekly basis, taking photographs and cargo temperatures, which should be sent to charterers to keep them informed of the cargo deterioration status, if any.

6. Keep track of the statutory inspection and sampling

Genetically modified soybeans are regulated goods and subject to compulsory inspection by Chinese Customs. Customs (or previously known as CIQ) officers will board the vessel to inspect the cargo and take samples when the vessel arrives.

In this regard, the Master or a surveyor should be instructed to take photographs of the whole inspection and sampling process and put same into record.

Did you subscribe to our daily newsletter?

It’s Free! Click here to Subscribe!

Source: skuld