[Watch] Incorrect Ballast Water Treatment Dosing Pipe Location

240
Credits: Marine Insight

The ABS Guide for Ballast Water Treatment requires that the dosing pipe penetrates the bulkhead from the engine room to the pump room as high as possible, preferably just below the main deck. The Guide also states that vapor seals need to be located just forward of the bulkhead and as high as possible in the pump room or on the weather deck within hazardous areas.

Watch the video here.

Did you subscribe to our daily newsletter?

It’s Free! Click here to Subscribe!

Source: Vimeo