Dalian Begins Work On New MSC LNG-Powered Vessel

502
Credits: Pixabay/ Pexels
  • Works on the new container vessel, which will be fuelled with liquefied natural gas (LNG), started on 3 April 2023.
  • The equipment of the new LNG vessel will contain an air lubrication system, shaft generator, and energy-saving guide wheel in front of the propeller.
  • The building of new MSC 16,000 TEU boxships in China has increased since the beginning of the year.

Dalian Shipbuilding (DSIC), a subsidiary of China State Shipbuilding Corporation (CSSC), has begun the construction of the 10th LNG-powered 16,000 TEU container ship for the Swiss shipping line Mediterranean Shipping Company (MSC).

New LNG-powered vessel

Works on the new container vessel, which will be fuelled with liquefied natural gas (LNG), started on 3 April 2023.

The boxship’s overall length will be approximately 366 meters, its breadth will be 51 meters, and it will be able to carry over 16,200 standard containers.

New equipment

The equipment of the new LNG vessel will contain an air lubrication system, shaft generator, and energy-saving guide wheel in front of the propeller.

The building of new MSC 16,000 TEU boxships in China has increased since the beginning of the year, with Dalian announcing a new 16,000 TEU vessel for MSC, MSC Chiyo, in January.

Did you subscribe to our Newsletter?

It’s Free! Click here to Subscribe.

Source: Container News